Sign in
Download Opera News App

kaplan

ECONOMY-FINANCE

Kindaruma hydroelectric power project.

Installed capacity – 3 x 24 (72) MW | Gross head - 42 m The project is owned and operated by the Kenya Electricity Generating Authority, constructed and first commissioned in 1968 and was the first of the major hydro schemes to be constructed on the Tana river.

  2 months ago ago
Kindaruma hydroelectric power project.