Sign in
Download Opera News App

Economy&Finance

 

Real estate

 

The Current Cost and Plan of Building a Palatial 3 Bedroom House in Kenya

Many people nowadays find it difficult to construct permanent houses because of the high cost of the required materials. However, when one make a proper planning it become easy to build a house to completion without feeling the burden of the associated costs.

Back in our societies, people use beautiful and admirable houses to tell the state, condition and position of a family. Therefore, it is better to struggle to make your house look as much beautiful as possible.

Basing on the above reason, I'm going to share with you one of the best cost friendly plans that will help you to avoid inconveniences and unforseen extra costs while building a 3 bedroom house in Kenya today. This simple budget will guide you on the estimated cost that you are likely to spend until completion of your house. Here is the budget:

3 foundation stones [email protected] 45=45,000

6 hardcore [email protected] 8000= 4,800,000

5 Dpm 7 [email protected] 2000= 14,000

20 marrum 10tons @ 2000= 20,000

15 Brc 8 rolls @ 25000= 200,000

100 sand 150tons @ 2000=300,000

30 quarry sand 60 [email protected] 1200=48,000

24 ballast 40 [email protected]=120,000

34 D 12 40pcs @ 980=39,200

25 D8 20 pcs @ 600= 12000

340 binding wire 400kgs @ 200= 80,000

150 anti termites gladiator 100litrs @ 1500=150,000

30 machine cut stones= [email protected] 65 = 65,000

600 cement [email protected] 700=525,000

800 bricks 300,[email protected] 10 =3,000,000

30 timber (6×1) [email protected] 30=45,000

45 timber (4×2) 5,[email protected]= 20,000

35 timber (2×2) [email protected]= 75,000

60 hup iron [email protected] 3000= 90,000

540nails [email protected] 200= 200,000

80 iron sheets [email protected]= 400,000

50 Ridges [email protected]= 55,000

50 door frames [email protected] 3000= 90,000

30 main doors and windows are estimated to take 487,500

48 gutters and accessories 300,000

20 water tanks 10,000 litrs = 200,000

45 fascia board (8×1)500fts @110= 55,000

35 wood preservative 16ltrs×10 @ 700= 112,000

This budget is approximately totalling to not more than 10 million. Labour is not included in this since it is mostly negotiable and depends with the contractor.

Content created and supplied by: @arapoutta (via Opera News )

COMMENTS

Load app to read more comments